How far ahead of Tet does a diaper wholesale importer in Vietnam book production?

How far ahead of Tet does a diaper wholesale importer in Vietnam book production?

Tet 2027 falls on 6 February, and Vietnam's public holiday runs from 4 to 10 February. For a diaper wholesale importer that means production has to be booked by late November, because 25 to 35 days of manufacturing, 7 to 10 days of sea freight and three to four weeks of clearance and sell-in all sit between the factory and the shelf. Miss the window and the container arrives in the week the country stops working.

The date is fixed and published, which makes this one of the few supply chain problems with a known deadline. The planning failure is rarely about the date. It is about the number of handoffs between booking and shelf.

Why does Tet move the whole order book?

Because the holiday closes factories, ports and retail buyers in the same ten days.

A Vietnamese factory typically shuts for five to nine days around Tet, and the days either side are lost to travel and to a workforce that thins out early. Ports keep operating but with reduced gangs, so vessel waiting times stretch. Customs officers work reduced shifts. Retail category managers stop approving new listings two to three weeks before the holiday because the reset cannot be executed.

The effect is that January is not a normal month. A container discharged at Cat Lai on 20 January may clear in four days in a normal month and in ten during the pre-Tet peak, and the difference is the difference between stock on shelf and stock in a yard. Add that uncertainty to the production lead time and the booking date moves back to November. For a diaper wholesale importer the working rule is to treat the production lead time as fixed and the clearance as the variable, then buy enough buffer to absorb the variable without touching the fixed part.

What is the working backwards calculation?

Start at the shelf date, subtract each leg, and add a buffer for the peak. Every step below is a range because the production lead time depends on the size and the pack, and the sea leg depends on the carrier's rotation that month.

  1. Shelf date: 15 January. Retailers want the Tet stock set two to three weeks before the holiday, because the last week is for sell-through, not for resets.
  2. Retail sell-in and haulage: 7 to 10 days. DC receipt, store allocation, and delivery to outlets outside Ho Chi Minh City.
  3. Customs clearance and port release: 4 days normal, up to 10 in the peak. Budget 7.
  4. Sea leg: 7 to 10 days from a South China port to Cat Lai, or 9 to 12 to Hai Phong.
  5. Production: 25 to 35 days from artwork approval, longer if a new pack size needs a plate.

Subtract the total, roughly 55 to 70 days with a buffer, from 15 January and the booking date lands in the first half of November. A 20GP booked on 25 November with a 30-day cycle ships in late December and clears in the second week of January, which is still workable if nothing goes wrong. Booked in mid-December, the container arrives during the holiday. That calendar assumes stock sizes; a new pack format adds 10 to 15 days to the production lead time because it needs a print plate and an artwork approval, and a diaper wholesale order for a first Tet should not depend on a new format.

Wrapped bales of Moni Happy diapers stacked four high, each bale showing the XXXL size and 44 piece count on an orange band, filmed together on a pallet
Bales ready to load in November: the size printed on the band is the size that has to be decided before production, not after.

How long is the sea leg into Vietnam?

Seven to ten days to Cat Lai, nine to twelve to Hai Phong, and the difference decides which port serves which region.

Cat Lai handles Ho Chi Minh City and the southern provinces, and it is the natural entry for a distributor whose first customers are in the south. Hai Phong serves the north, including Hanoi, and adds two to three days of sailing plus a longer haul to the southern market. A distributor covering both regions either splits the order across two ports or accepts a 1,500 km domestic haul, which on a 20GP of diapers adds a meaningful cost per piece.

Booking early also secures the sailing, not just the production slot. Space on the intra-Asia strings tightens from mid-December as everyone tries to land goods before the holiday, and a rolled booking in that window can cost a week.

What happens to customs clearance before Tet?

Volume rises, staffing falls, and the queue is longest in the ten days before the holiday.

Vietnamese importers file through the VNACCS system, and the declaration itself is fast. The delay sits in physical inspection and in the payment of duty and VAT, both of which slow when the banks and the customs offices work reduced hours. A container selected for inspection in the peak can wait three to five days for a scan, and a customs clearance file opened a day late can miss the bank cut-off and lose another two.

Two preparations reduce that risk. File the declaration as soon as the arrival notice is issued rather than waiting for the original bill of lading, using a telex release or a sea waybill where the supplier accepts it. And confirm the HS code and the duty rate in advance, because a classification query in the peak week is a week lost. Diapers under HS 9619 attract different rates depending on the ASEAN origin and the form of the certificate of origin, and a missing Form D turns a preferential rate into the MFN rate at the worst moment. A distributor who files the same customs clearance papers every season makes fewer of these mistakes than one who files once a year.

Rows of palletised diaper bales in a warehouse, each pallet wrapped and stacked six bales high, filling the frame from floor to mid height
Pallet rows waiting for the sailing: space booked in November is space that exists in January.

Which sizes move first in a Tet order?

M and L, with XL close behind, and the mid-count multipack rather than the smallest pack.

Tet is a family holiday and a nappy is a common gift between relatives, so the sizes that fit a six to eighteen month old move fastest. Newborn packs sell steadily but they are bought by parents, not by relatives, and the gift purchase skews to the size that looks substantial. A Tet order weighted to newborn will leave the distributor with the wrong inventory for six weeks.

The pack format matters as much as the size. A mid-count multipack reads as a gift; a small pack does not. Distributors who have run Tet before typically shift 60 to 70 percent of the Tet order into M, L and XL in the mid-count format and keep the rest for the regular replenishment lines.

What does a confirmed Tet order look like on paper?

Three fields: a production start date, a vessel and a named port of discharge.

An order that exists only as a chat message is not a booking. Intentions get queued behind confirmed orders when the factory fills its January capacity, and the buyer discovers the queue when the production start date slips by a fortnight. Ask for the start date in writing, the estimated departure and the port of discharge, all of which the factory or the forwarder can supply within a week of the deposit clearing.

The deposit is part of the same plan. T/T 30/70 means 30 percent on order confirmation and the balance against documents, so a booking taken in late November needs the 30 percent to land before the production slot is released. A buyer who confirms a Tet order and pays in December has usually booked a slot someone else already holds.

What if the booking window has already passed?

Three options, and only one of them protects the shelf.

  • Take stock sizes from available production. A size that is already running needs no plate and no artwork approval, so the lead time drops to 20 days or less. Accept a narrower size range instead of a late full range.
  • Split the order. Ship a partial container by sea in December and top up in January by less-than-container freight if the volume justifies it. The freight penalty is real but smaller than an empty shelf during the peak selling weeks.
  • Shift the volume to the post-Tet window. Late February and March are quiet, and a distributor who plans a second wave then often sells more than one who fights for January space. The risk is that the retailer has already reset the bay with a competitor's line.

Whichever route is chosen, the decision has to be made before the factory publishes its holiday schedule, because the shutdown dates set the last production day. Our partner team publishes the Tet cut-off with the quotation, and the wholesale price and MOQ guide explains how a split order affects the per-piece cost.

Frequently asked questions

When is Tet in 2027?

6 February 2027. The public holiday runs from 4 to 10 February for public sector employees, and private employers choose a schedule inside that window. Factories typically close for five to nine days.

What is the realistic booking deadline?

Late November for stock on shelf by mid-January. Production takes 25 to 35 days, the sea leg 7 to 10 days, and clearance plus sell-in another three to four weeks with a buffer for the peak.

Does air freight solve a late order?

For samples and top-up cartons, yes. For a container, no. Air freight on diapers costs 8 to 15 times the ocean rate per kilogram, and a 20GP weighs about 3 tonnes, so the freight would exceed the goods value.

Which sizes should a Tet order favour?

M and L first, then XL, in the mid-count multipack. Gift purchases skew to the size that looks substantial, and newborn packs are bought by parents rather than relatives.

Sources and further reading

Bottom line. Tet is a fixed date and a fixed holiday, so the only variable is how early the order is booked. Late November is the working deadline for a January shelf date, and the buffer has to cover production, sailing, clearance and sell-in. An order placed in December is a bet that nothing in the chain slips, and in the peak week something usually does.

Frequently Asked Questions

When is Tet in 2027?

6 February 2027. Vietnam's government has approved a seven-day public holiday from 4 to 10 February 2027 for public sector employees, and most private employers choose one of three schedules inside that window. Factories typically close for five to nine days across the period.

What is the realistic booking deadline?

Late November for a container that must be on shelf by mid-January. Production runs 25 to 35 days, the sea leg from a South China port to Cat Lai is 7 to 10 days, and clearance plus haulage plus retail sell-in needs another three to four weeks.

Does air freight solve a late order?

For samples and top-up cartons, yes. For a container, no. Air freight on diapers runs 8 to 15 times the ocean cost per kilogram, and a 20GP of diapers weighs about 3 tonnes, so the freight bill would exceed the goods value on most size mixes.

Which sizes should a Tet order favour?

M and L, then XL. Tet is a family gathering holiday and gifts of diapers are common, so mid sizes move fastest, and the packs that sell are the mid-count multipacks rather than the smallest newborn packs.

🏷 Related topics: Moni Happy BrandDiaper Industry & PartnershipsBaby Care Basics

If you are evaluating suppliers for your market, these are the pages that answer the commercial questions — in the order buyers usually need them.

Explore Moni Happy

WhatsApp +8618149516506 Phone +86 18149516506 Email [email protected]
Moni Happy WeChat QR code WeChat Scan to add us