2026-11-20 · Moni Happy
How long does a diaper wholesale buyer have to file a claim after delivery?
Seven days for visible damage, 14 for a short count, 30 for a quality result and 60 to 90 for a hidden defect, all starting from the moment the container is delivered rather than from the moment someone opens it. A diaper wholesale buyer who inspects in week three has already lost the first two, and losing the first two usually means losing the argument, because a supplier will ask why damage that was visible on day one took 20 days to report. The rights exist. They just run on clocks that nobody puts on the delivery note.
When exactly does the claim clock start?
Earlier than the buyer expects, because risk transfers before the goods arrive.
The claim window is not one date, it is four, and they all start together.
On FOB and CIF terms the risk passes when the cargo is loaded on board, which means the buyer owns the risk for the whole ocean leg and the clock starts before anyone has seen a carton. On DAP or DDP terms it starts at the named destination. This matters because a claim about a wet pallet after a monsoon transit is a claim against the insurer or the carrier, not against the supplier, and the buyer only discovers which one when they read the Incoterm on the invoice.
The practical point: write the delivery date into the receiving record on the day the container is unstuffed, not the day the paperwork is filed. Every subsequent deadline is counted from that date, and a week lost to internal paperwork is a week off the end of the window.
How long do you have for visible damage?
Seven days is the common contract figure, and 48 hours is what the carrier will ask for.
The claim window for visible damage is the one buyers miss most often, because a container that looks acceptable at a glance gets signed for. A crushed carton, a torn pallet wrap, water staining on the outer rows: all of this is visible at the door and has to be photographed before the container is emptied. Most supplier contracts in this trade set 7 days for a written notice of visible damage, and many set a shorter 3-day notice for the carrier. The two clocks run in parallel and the shorter one governs the recovery you can actually pursue.
What counts as enough: a dated photograph of the damage in place, the carton count affected, the container or seal number, and a written notice referencing the invoice. What does not count: a WhatsApp message saying some cartons were squashed, sent without a photograph, three weeks later.
What about a short count?
Fourteen days, and it is the easiest claim to win if the count is done at the door.
A claim window of 14 days sounds generous until the container lands on a Friday and the warehouse has no forklift free until Tuesday. A container that arrives with 486 cartons against an invoice of 500 is a documented fact, not an opinion, provided someone counted while the box was being emptied. The window is usually 14 days because that is how long a warehouse needs to reconcile a receipt, but the evidence has to be created on day one. Counting after the cartons have been mixed into existing stock is where short-count claims die.
Reconcile the count against the packing list before signing the delivery receipt, and note the discrepancy on the receipt itself. A signed clean receipt followed by a claim two weeks later is a claim the supplier will decline as a matter of course, and they are usually right to.

How do you claim a defect that appears in week six?
Only through a hidden defect clause, which is a contract term rather than a legal default.
Some failures cannot be seen on arrival: an adhesive that lets go after four weeks in a hot warehouse, a backsheet that becomes brittle, a waistband that relaxes in storage. These fall outside the inspection window by definition, and the only mechanism that covers them is a clause in the supply agreement giving a longer period, commonly 60 to 90 days from delivery, sometimes 6 months for a defined list of failure modes.
Write that clause with a failure definition attached. A clause that says defects will be remedied within 90 days is worth little, because the argument moves to whether the defect is a defect. A clause that names adhesive creep at 40 degrees, backsheet tensile after aging, and waistband recovery after 30 days gives the laboratory something to test and the claim something to stand on.
Where does the carrier's deadline differ from the supplier's?
The carrier gives you a year to sue and three days to complain, and the second number is the one that binds.
Ocean carriage limitation periods run 12 months under the Hague-Visby regime, which sounds generous until the notice requirement is applied: damage has to be notified to the carrier or its agent at delivery, or within three days where the loss is not apparent. Fail that and the carrier will argue the cargo was received in good order, whatever the limitation period says. Cargo insurance policies carry similar notice terms, often three days from delivery or from the date the loss should have been noticed.
The notice of defect you send the carrier is a separate document from the notice of defect you send the supplier, and both go out in the same week, even when the cause is not yet known. Notice preserves the right to claim; it does not commit anyone to a position.
How do you keep a claim alive across two countries?
By making the notice do the work before anyone has to choose a forum.
- Send one notice, to three parties. Supplier, freight forwarder and insurer, each within their own window, all referencing the same invoice and container number.
- Preserve the physical evidence. Keep 2 to 5 cartons unopened and photographed, with the batch code legible. A batch code is how a factory traces a run, and without it the supplier cannot investigate even if they want to.
- Get the inspection done by a third party above the contract threshold. A surveyor's report is admissible in both jurisdictions; an internal warehouse note is not.
- State the remedy you want. Replacement cartons, a credit note, or a price adjustment. A notice that only complains gets a reply that only apologises.
A diaper wholesale buyer running one container a quarter has no routine for this, which is why a notice of defect template is worth writing before the first shipment rather than during the first dispute. Then check the law on each side before assuming the contract governs. Malaysian sale of goods rules make inspection a duty of the buyer, and a buyer who fails to inspect loses the right to reject. Vietnamese commercial practice allows a claim period measured in months for quality and quantity, but the contract's shorter window usually governs. Neither system rescues a buyer who did nothing for three weeks.
Can the claim window be extended in the contract?
Yes, and it is one of the few terms a first-time buyer can win without paying for it.
Suppliers accept a 30-day quality window and a 90-day hidden defect window more readily than they accept a price cut, because the exposure is bounded and most claims under it are small. Ask for the extension at the point of the first purchase order, when the relationship is still being set up, rather than after an incident. Ask for the claim window in writing at the same time, and ask also for the inspection standard to be named: which laboratory, which test method, and who pays if the result is inside tolerance.
The other term worth having is a defined response time from the supplier, 10 working days to answer a notice, with the clock stopping if evidence is supplied. Both terms cost nothing on a normal order and decide everything on a bad one. Our distributor onboarding guide covers where these clauses sit in a first agreement, and a partner enquiry will get you the claim procedure that applies to a Moni Happy shipment.
Frequently asked questions
Does a claim stop the payment clock?
Only if the contract says so. A T/T balance usually falls due on documents, not on inspection, so a claim runs alongside the payment rather than pausing it.
How much does a claim usually cover?
Carton value, not lost profit. Consequential loss is excluded in almost every supply agreement, which is why inspection speed matters more than claim size.
Can I claim for cartons damaged in my own warehouse?
No. Once the goods are under your control the risk is yours, and that is where a warehouse policy takes over from cargo insurance.
What if the supplier simply does not answer?
Escalate to the insurer and the forwarder in writing, and keep the file open. Silence does not extend the window, but it does support a later argument about good faith.
Sources and further reading
- ICC Incoterms 2020 — the point at which risk and cost transfer between seller and buyer.
- Royal Malaysian Customs — import clearance and documentation requirements.
- World Shipping Council — carrier liability and cargo claim practice references.
Bottom line
Four clocks start at delivery and none of them wait for an internal process. Photograph and count at the door, send one notice to supplier, forwarder and insurer in the same week, and put a hidden defect clause with named failure modes into the first purchase order. The claim you lose is almost always the one you were entitled to and reported late.
Frequently Asked Questions
When does the claim window start?
At delivery, or at the point risk transfers under the Incoterm. Under FOB and CIF that is loading, which means the buyer's clock starts before the goods arrive.
What happens if I inspect in week three?
Visible damage and short count windows usually close before that. A late inspection does not create a claim, it records a loss the buyer has already accepted.
Is a hidden defect covered after the window closes?
Only if the contract has a separate hidden defect clause. Without one, a defect found in month three is a commercial conversation, not a claim.
Do I need a survey report?
Above a threshold set in the contract, usually a few hundred dollars, yes. Below it, dated photographs and a joint count with the warehouse are enough.
Distributor resources
If you are evaluating suppliers for your market, these are the pages that answer the commercial questions — in the order buyers usually need them.